Cedar Pocket Rd Jimboomba QLD - Foamed Bitumen Stabilisation
/RPQ division:
TRICO Asphalt
Project date:
September 2015
Client:
Logan City Council
Details:
The project site was part of road upgrade project that was being completed by Logan City Council to accommodate future residential growth in this area. A 1 kilometer section of this road becomes inundated during heavy rainfall and LCC required a pavement material that would withstand these conditions. TRICO Asphalt were contracted to supply and place a plant mixed foam bitumen stabilised roadbase in a 150mm layer to this area. The material was placed with grader and cut to survey levels. This was completed in 3 days.